Deutz 1012 Especificações Página 35

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 282
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 34
Service Training
Page 27
Section 4.1
09.06
LEAK TEST
- Dry nozzle and nozzle holder by compressed air.
- Press hand lever of tester slowly down until apressure
of approx. 20 bar below the previous opening pressure
reading is attained.
- The nozzle is leak proof if there is no dripping within
10 seconds.
- If there is dripping, dismantle the injector and clean to
remedy the leak. If this does not work, replace the
nozzle by a new one.
- No reworking allowed!
Vista de página 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 281 282

Comentários a estes Manuais

Sem comentários