Deutz 1012 Especificações Página 129

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 282
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 128
Service Training
Page 4.2
Section 71
09.04
noyes
K
noyes
noyes
Install LP gauge with adapter III to ports YF and ZF of power limiter. Repeat the
test.
I
noyes
L
M
Δp 0 - 0,5 bar.
Δp now 0 - 0,5 bar.
Δp 0 - 0,5 bar.
Check or renew travel
control unit.
Equal pressure
can be achieved.
Check for equal pressure, see "Pressure equality and start of control".
Remove adapter III and install adapter II with plug. Connect LP gauge and
determine Δp with the brake released and engine running.
Leak in hydraulic remote
control. Repair or renew
the remote control.
Power limiter defective
(nozzles in ports YF/ZF
maybe clogged).
Vista de página 128
1 2 ... 124 125 126 127 128 129 130 131 132 133 134 ... 281 282

Comentários a estes Manuais

Sem comentários