Deutz 9929en Informações Técnicas Página 62

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 85
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 61
6
9929en
62
6.6.1 Check Valve Clearance, adjust
if necessary
Remove cylinder head cover.
Position crankshaft as per schematic, see 6.6.1.1.
Before adjusting valve clearance, allow engine to
cool down for at least 30 minutes. Oil tempera-
ture should be below 80°C.
Check valve clearance 1 between rocker arm /
tappet contact face 2 and valve stem 3 with feeler
gauge 6 (there should be only slight resistance
when feeler blade is inserted).
For permissible valve clearance, see 9.1.
Adjust valve clearance if necessary:
- Release locknut 4.
- Use Allan key 7 to turn setscrew 5 so that
correct clearance is attained after locknut 4 has
been tightened.
Check and adjust valve clearance on all cylin-
ders.
Reinstall cylinder head cover, with new gasket if
necessary.
Service and Maintenance 6.6 Adjustments
© 19 691 2 © 25 893 0
Vista de página 61
1 2 ... 57 58 59 60 61 62 63 64 65 66 67 ... 84 85

Comentários a estes Manuais

Sem comentários